Halls Head
Go2 Homes were engaged to construct a bathroom addition in the existing storeroom area of the house. The front office was converted
into a bedroom with the new bathroom forming an ensuite. The new bathroom features a feature wall tile installed with a horizontal herringbone pattern, stone bench tops with undermount sinks and a back to wall toilet with an in-wall cistern concealing all services. Also, full height tiling with a new skylight. A kitchenette was installed to the theatre and facade works to the front elevation.