Hampshire II
Not this color. Construction on this 5' pool will begin in three days. This is what the interior of the pool will look like. It will be surrounded by our gray cement tiles. George will receive the key to Suite #2 in two days. I will receive the key in 10 days. It will be delivered to me and put in my hand (dic.)
On the north side of the properties (A, H, B and J and S's), a wall will be constructed that will range along the north perimeter and attach to the wall on the west side of all said properties. Where the lifts are, a solid brick wall will be build on the north perimeter: There are 4 lifts behind H's. The existing garage will be moved to accommodate our needs. The solid wall will continue behind B's property. The ceiling will be the same windows and mouldings that are above A's sunroom, the lower part of the windows rest on the solid wall, the higher part will rest on the north walls of H and B's properties and so on.
5 of these with glass tops and 2 gold chairs each
We will have 7 of these built-in closets painted navy (with the little closets above) in the mudroom: Two of them will have drawers from the bottom of the closet to 2/3 of the way up; one for maxi coats and one for King's robes. There will be a place to hang long wet coats too; a rubber mat for wet boots and shoes; wet umbrellas, hats and scarves. There will be hydronic cleaning (for all closets,) the tray and the wet articles. The dry and clean coats go in another 2 built in closets. The shoes and boots go on a tray under the seat. There are 3 of them. The clean shoes and boots go in our closets. This room is accessed by the side and front doors only.
The freezer drawers will be 15" Deep, at least 15" W and 8" High. There will be 3 freezer drawers. This is the color blue.
This is the arch in the front hall. The front hall is panelled.
Outside staircase, halls and bedroom entrances and this is the design of all the paneling. Needs hydronic cleaning.
George's tunnel, from his closet to his bedroom
In the Sunroom and garage spaces
ocean theme, this is a design throughout. There are 8 of these, 4 per house. The cement tile goes around this. The cement tile will be put in Monday, Oct. 5, 2020, with the medallions.
This cement around the door.
This fireplace in kitchen, glassed in so cat can sit on ledge. White only.
A gorgeous office. White though.
my library shelves
This is the door from the garage to the sunroom, painted navy blue. This uses the original frame of the entrance. It will be a big door, with a tall glass wall above it. It will open and close beautifully.
our entryway table
if the frames were white painted wood
This work will begin in 2 days
if the frames were wood, painted white
This work begins immediately. This is the walls and ceiling of the sunroom and the ceiling of the garage. The existing eastern wall of the properties [in A's (Amy's) Sunroom] will be moved, leveled and rebuilt using our bricks. The windows above will rest on top of a beautiful moulding above brick struts and windows where the ceiling is lower, and where the ceiling is higher, they will rest on top of A's building, the eastern wall . Each window is one piece of glass and does not open. Same with windows between brick struts. The windows above have similar beautiful moulding.
my urn collection has to be moved and moved back in
Around the garage.
We have a gardener. All the houses.
We will each drive every day. He will pull the car out for each of us. George, Amy, Jim, Haley and Brooks.
Cleaning. White 1s too. All 10 houses. We do our own laundry.
in John's yard, but the pedestal is white
silver
silver
silver
In John's yard
4 of these each garage
George's walkway like this from #204 to the back door of 201, under the vaulted ceilings
8 of these dining room chairs
16 of these lighter Duran chairs hanging in Sunroom, 8 of these in kitchen
16 of these in Sunroom, 8 of these in kitchen, hanging on the wall
The Playroom, also a beautiful sound room, my music instruments are in here with 3 music chairs and a side table. Library shelves too.
Q